genlp
genloop
Genloop · Sell

Sell Your Retired or Surplus Power Plant

Genloop buys retired, mothballed and surplus power generation equipment as principal, from 15 MW up, and handles the removal.

01 · What we buy

Fifteen megawatts and up.

Genloop acts on single units from 15 MW and on whole plants; the typical transaction is around 100 MW. 50 or 60 Hz, gas, liquid fuel or steam, running, idle or mothballed.

Size
15 MW and up
Single units and whole plants
Typical deal
100 MW
The typical transaction
Grid
50 or 60 Hz
Gas, liquid fuel or steam
Condition
Running or not
Running, idle or mothballed

Gas turbines

Heavy-frame and aeroderivative, simple or combined cycle, with or without the balance of plant. Running, idle or preserved.

Combined cycle plants

Complete blocks: gas turbine, HRSG, steam turbine, generators, transformers and auxiliaries, bought whole and relocated whole.

Reciprocating engine plants

Multi-engine plants on gas, heavy fuel oil or diesel, with balance of plant, spares and tooling.

Steam turbines

Condensing and back-pressure units from retirements, repowering and process sites, with or without the steam source.

Generators and transformers

Turbine generators, GSU and auxiliary transformers, bought with a plant or on their own.

Capital parts

New, new-old-stock and reconditioned blading and hot gas path components, with records.

Selling a specific machine
GE Frame 5Heavy frame · 50 or 60 Hz → GE Frame 6BE-class · 50 or 60 Hz → GE 7EAE-class · 60 Hz → GE 7FAF-class · 60 Hz → GE 9EE-class · 50 Hz → GE 9FAF-class · 50 Hz → GE LM2500 and TM2500Aeroderivative · fixed or mobile → GE LM6000Aeroderivative · 50 or 60 Hz → GE LMS100Aeroderivative · 50 or 60 Hz → Siemens 501D5E-class · 60 Hz → Siemens 501FF-class · 60 Hz → Siemens V94.2E-class · 50 Hz → Siemens SGT-800Industrial · 50 or 60 Hz → Mitsubishi M501FF-class · 60 Hz → Alstom GT11N2115 MW · 50 or 60 Hz → Alstom GT13E2E-class · 50 Hz → Alstom GT24 and GT26F-class · 60 Hz GT24, 50 Hz GT26 → Pratt & Whitney FT8Aeroderivative · fixed or mobile → Rolls-Royce Trent 60Aeroderivative · 50 or 60 Hz → Wartsila engine plantReciprocating engines · gas, HFO or dual fuel → Steam turbineCondensing or back-pressure · from 15 MW →
02 · Who sells to us

Four situations we see most.

Different owners, the same need: a price that holds, and the equipment gone on a date that holds.

Utilities and IPPs

Retiring a plant, replacing a frame or closing a site, and wanting certainty of price and removal without running a sale process.

Industrial owners

Captive generation that no longer fits the site: a process change, a new grid connection, or a plant sold without its power island.

Receivers, lenders and trustees

Equipment inside an insolvency or a foreclosure, where it has to be valued, sold and removed on a court or lender timetable. Genloop’s leadership has served as court-appointed valuation expert and market advisor in these situations.

Developers and EPCs

A project that stalled with equipment built, delivered or part-installed, and needs a buyer who can take it whole.

03 · How a sale works

Four steps, one counterparty.

The owner signs with one firm that is accountable from the first call to the site handback.

01

Records and a call

Nameplate data, hours and starts, and the last outage report are enough to begin. A call with Genloop’s engineers follows, and a view on value comes out of it.

02

Inspection

Genloop’s engineers inspect on site, review the records and assess the rebuild scope. The judgement is made in-house, not outsourced.

03

Offer and contract

A firm offer for the equipment as it stands, on Genloop’s paper, with price, scope of removal and timing in one document.

04

Removal

Dismantling, export compliance and transport are Genloop’s scope, insured throughout. The site is handed back on the schedule the contract sets.

04 · What you get

Price certainty, and the equipment gone on the date the contract says.

No fee, no processGenloop buys as principal
One contractPurchase, removal, handback
Removal handledExecuted and insured by Genloop
A second lifeRestored, re-warrantied, redeployed
In execution nowLive mandates →
Combined-cycle asset7EA class CC · Latin America
Utility rebuild + capacity PPA6× Frame 7 · United States
Fleet divestment mandate600 MW recip · Southern hemisphere
05 · Questions

What owners ask first.

The short answers. The detail is in the contract, and in the call that comes before it.

What size of equipment does Genloop buy?

Single units from 15 MW, and whole plants. The typical transaction is around 100 MW. Gas turbines, combined cycle blocks, reciprocating engine plants, steam turbines, generators, transformers and capital parts, at 50 or 60 Hz.

Who sells power generation equipment to Genloop?

Utilities and IPPs retiring or replacing capacity, industrial owners with captive generation they no longer need, receivers, lenders and trustees handling equipment inside an insolvency, and developers or EPCs with a stalled project.

How does selling a power plant to Genloop work?

Four steps with one counterparty: records and a call, an on-site inspection by Genloop’s own engineers, a firm offer and contract on Genloop’s paper covering price, removal and timing, then removal executed and insured by Genloop.

What information do I need to get an offer?

Nameplate data, operating hours and starts, and the last outage or inspection report are enough to begin. Drawings, manuals, site constraints and title details follow. Gaps are normal and Genloop fills them on site.

Does Genloop charge a fee?

No. Genloop buys as principal and takes title, so there is no fee, no marketing period and no waiting for a buyer to appear.

Does Genloop buy equipment that is not running?

Yes. Genloop buys units that are running, idle or mothballed, and equipment from a stalled project that is in storage, delivered or part-installed.

What is investment recovery?

It is the term utilities and plant owners use for getting capital back out of equipment they no longer need. Genloop does it by buying the plant or turbine outright, removing it, and returning it to service on another project.

Who handles dismantling and removal?

Genloop does. Dismantling, export compliance and transport are Genloop’s scope, insured throughout, and written into the same contract as the purchase. The site is handed back on the schedule the contract sets.

06 · Direct

Tell us about the asset.

Every enquiry is read by the people who inspect, value and buy the equipment, and answered directly. Owners rarely have everything; send what exists and Genloop fills the gaps on site.

What to send, if you have it
Nameplate and configuration

OEM, model, rating, frequency, fuel, and what is included: generator, transformer, HRSG, balance of plant.

Operating history

Hours, starts, fuel burned, and the duty the unit ran: base load, peaking, standby.

Outage and inspection reports

The last major outage, the last borescope, and any open findings. Gaps are normal; say where they are.

Drawings and manuals

General arrangement drawings, P&IDs and the OEM manuals, in whatever form they survive.

Site and removal constraints

The window in which the equipment must be gone, crane and road access, and any export or permit requirements.

Title and encumbrances

Who owns the equipment, and what has to be released at closing.